Construction Work of Biomass Boiler Package System in Nestlé Pasuruan Factory :
- Boiler Thermax CPRG250 Biomass Boiler
- Capacity 25 ton/hour
- Scope of Work
- Material unloading/lifting
- Steel structure erection
- Erection of boiler package (fuel handling, pressure part, ESP, chimney, ash silo)
- Refractory & insulation work
- Installation of BOP (piping, rotating equipment, electrical & instruments)
- Commissioning
- Currently ongoing project