CALL US
+62 (21) 8991 4837
E-MAIL
sales@petrologmum.co.id
WORKING HOURS
Mon. - Fri. 08AM - 17PM

Catalog

CPRG100 Boiler – Karawang

Construction Work of Biomass Boiler Package System in Nestlé Karawang Factory :
  • Boiler              Thermax CPRG100 Biomass Boiler
  • Capacity         10 ton/hour
  • Scope of Work
    • Material unloading/lifting
    • Steel structure erection
    • Erection of boiler package (fuel handling, pressure part, ESP, chimney, ash handling)
    • Refractory & insulation work
    • Installation of BOP (piping, rotating equipment, electrical & instruments)
    • Commissioning
  • Currently ongoing project

 

 

 

 

More Information:
epc@petrologmum.co.id

Jl. Sungkai Blok F 26A No. 01B Delta Silicon Lippo Cikarang, Bekasi 17530,  Indonesia

 

Call Us For Support:
Phone : +62 (21) 8991 4837
Fax      : +62 (21) 8991 5411

 

 

Product Description

 

The Company has highly experienced project management team to manage and execute EPC projects, and adequate workshop facilities for fabrication work.

WordPress Theme built by Shufflehound. Copyright 2018 PetrologMUM . All rights reserved.